Recent Projects

Union City elementary school

  • Removal of existing canopy
  • Replacement all new concrete sidewalks and ADA’s

PHN Dumpster pad

Conneaut Lake Streetscape

  • Temporary traffic control
  • Removal and installation of concrete curb and sidewalks
  • under drainment
  • New ADA accessible curb ramps
  • Lighting and pedestrian crosswalks

Hobby Lobby Hermitage PA

  • Demolition of front exterior existing structure
  • Excavation and installation of new cast in place concrete grade beam for new store front
  • Installation of concrete dumpster pad and bollards
  • Removal and installation of new concrete sidewalks along store front
  • Interior floor replacement
  • Interior demo
  • Sanitary sewer lateral

Hermitage Access Road

  • Installation of underdrains and storm sewer along new roadway
  • Removal and installation of new 36″ culvert pipe and headwall
  • New concrete Curb and sidewalks
  • New paved roadway

T Bruce sales

Hermitage Roundabout

Combine Construction performed all concrete services for the Hermitage roundabout ECMS project