Recent Projects
Union City elementary school
- Removal of existing canopy
- Replacement all new concrete sidewalks and ADA’s
PHN Dumpster pad
Conneaut Lake Streetscape
- Temporary traffic control
- Removal and installation of concrete curb and sidewalks
- under drainment
- New ADA accessible curb ramps
- Lighting and pedestrian crosswalks
Hobby Lobby Hermitage PA
- Demolition of front exterior existing structure
- Excavation and installation of new cast in place concrete grade beam for new store front
- Installation of concrete dumpster pad and bollards
- Removal and installation of new concrete sidewalks along store front
- Interior floor replacement
- Interior demo
- Sanitary sewer lateral
Hermitage Access Road
- Installation of underdrains and storm sewer along new roadway
- Removal and installation of new 36″ culvert pipe and headwall
- New concrete Curb and sidewalks
- New paved roadway
T Bruce sales
Hermitage Roundabout
Combine Construction performed all concrete services for the Hermitage roundabout ECMS project